Friday, October 2, 2015

SAP PM Preventive Maintenance - Single Cycle Plan

Time Based Single Cycle Plan 

Single Cycle Plan is much simpler to execute the plan which used to create  for regular and repeated periodic maintenance. Its used for simple maintenance cycles. No strategy used in single cycle plan.

Two types of  single cycle plan :

1. Time Based : Maintenance is performed in specific cycles for time-based maintenance planning, for example, every month, two months or every six months.

2. Performance Based : With performance-based maintenance plans, you can plan regular maintenance based on counter readings maintained for measuring points at pieces of equipment and functional location

Process Flow Chart

Single Cycle Maintenance Scheduling

Process Steps:

Step 1 : Create General Maintenance Task List - IA05


Task List IA05
PM Task List
Task List Operation


SAVE

Step 2 : Create Single Cycle Plan - IP41


SAP PM Single Cycle Plan IP41
    Save


Step 3 : Schedule Maintenance Plan – IP10

 

Maintenance Plan Scheduling


Plan Start Cycle

Note : Here Call date means System will call a Maintenance Order on 07.10.2015 which will schedule for 08.10.2015.

Dead Line Monitoring - IP30.



Now Check by IP10





Now Check the Order List by IW38






Now do the  procedure on this order as usual like other maintenance order and close it.
After Confirmation and TECO please check by IP10. First Schedule will be showing Close.


END.